Criteria Page of the Replan Wizard
Use this page to select which code of the project you want to replan.
Contents
| Field | Description |
|---|---|
| Criteria | Use field to select one of the following options:
|
| Selection | This field is available only if you selected a criterion other than
Total Project in the
Criteria field. Click
|
| Include all children | This option is available if you select a code with children in the
Selection field. Selecting this option instructs Cobra to run the process against the parent code and its children. For example, if you selected WBS code 1 in the
Selection field and this has child codes 1.1 and 1.2, then Cobra will run the process against codes 1, 1.1, and 1.2.
This option is enabled only for code criteria that are hierarchical in nature, such as WBS and OBS. |
Parent Topic: Replan Wizard